The Future of Offshore Wind is Floating; Are We Ready?

January 30 2023

An Overview of the Technical and Supply Chain Challenges Facing Floating Wind

By William Walker, Ph.D.

Offshore Wind Energy Turbine

“At Stress Engineering Services, we’ve been working in energy for 50 years. Our decades of experience in traditional energy solutions, combined with our unparalleled technical  expertise across all other business areas, such as aerospace and defense, consumer products, and medical technologies, are the ideal toolbox to address the technical and commercial challenges renewable energy faces.” -Jack Miller, President, Stress Engineering Services

Introduction

The offshore wind industry is experiencing significant growth globally, with numerous countries setting national goals for development by the end of the decade. Much of this global offshore wind growth is expected to be floating wind. In December 2022, the Bureau of Ocean Energy Management (BOEM) held the United States’ first lease auction on the pacific coast, where the water depth will require floating wind technology. Additionally, BOEM plans to lease auctions in Oregon, the Gulf of Mexico, the Gulf of Maine, and the Central Atlantic within the next few years. Some of these lease areas will require floating technology.

Outside of the United States, there have been significant advances in floating wind development. For example, in February, the United Kingdom’s ScotWind auction included 15 G.W. of floating wind lease areas, and similar strides toward floating wind are happening in other regions of Europe and Asia.

Offshore Wind Energy Infrastructure

Figure 1. Windfloat Atlantic

 

Currently, floating offshore wind is still in the pilot project stage, and as of the end of 2021, there were ten floating wind pilot projects in operation between Europe and Asia [1]. However, now that commercial-scale floating wind has entered the pipeline, the technology and infrastructure required to bring these projects to life need to be commercialized. With nearly 80% of the world’s offshore wind resources existing in water depths greater than 60 m (58% of the United States resource), the future of offshore wind undoubtedly includes significant amounts of floating wind farms. In this article, I discuss the industry’s technical and supply chain challenges.

Technical Challenges

Floating wind has been an important industry discussion topic in 2022. Much of the technology floating wind farms will require is under development, and pilot projects are currently in operation. However, the industry is not well established like its fixed-bottom counterpart, and there is still a wide range of research and development needed to make this industry a reality.

As we discuss technical challenges, it is essential to note that we are implying the challenges centered around developing economical, technical solutions. In other words, does the technology that enables an economic Levelized Cost of Energy (LCOE) exist? Current demonstration projects in Europe and Asia provide great insight into this question, as does our 50 years of experience serving the offshore oil & gas industry at Stress Engineering.

At SES Renewables, Stress Engineering’s renewable energy group, our team has a long history of offshore engineering and sees several significant challenges that should be addressed to develop low-cost solutions for floating wind.

Mooring Reliability

Floating wind turbines use the minimal number of mooring lines possible to maintain a station (e.g., 3 or 4 lines). While a solution with three lines keeps the floater in place, it offers little room for failure and no redundancy.

The oil & gas industry typically uses far more mooring lines (e.g., 16, 24 lines). This is partly due to the extensive production facilities requiring additional station-keeping lines. Additionally, it provides redundancy in the event a mooring line fails. Moreover, failed mooring line scenarios are considered in design with the expectation that it could occur.

If a mooring line breaks in a 3-mooring-line scenario, the floater will not be able to maintain the station effectively. Consequences of such a failure may include failure of the other two mooring lines and the power cable. Furthermore, if a floater came completely unmoored, it could impact other turbines in the field, and the asset itself could be lost. The costs incurred by lost production, rebuilding, and reinstalling a floating wind turbine could be pretty significant, as evidenced by such failures in the oil & gas industry [2]

Mooring line failures occur, and the oil & gas industry has seen its fair share. The probability of a failure is highest after installation (i.e., due to an installation error), near the end of its life, and during severe weather events (e.g., hurricane, tsunami). Unfortunately, the current pilot projects haven’t operated long enough to see how these systems will behave in the latter portion of their design lives.

Mooring and Anchoring Costs

Mooring and anchoring are significant expenses in any offshore development, which could be substantial for deep-water floating wind farms. For example, consider a 100-turbine wind farm in a 1000-meter water depth in a 3-line spread-moored configuration. Each mooring line may need to be 2000 meters in length, which would be a total of 600 km of mooring line. Manufacturing, transporting, and installing such a large number of mooring lines and anchors is unprecedented, far beyond anything the offshore oil & gas industry has undertaken. As a result, the cost and the time required will be high.

Shallow Water Mooring

The mooring challenges differ in shallower water floating wind farms (i.e., 60 – 300 meters). The oil & gas industry doesn’t use floaters in such shallow water depths, and the typical spread moored solution oil & gas has utilized for decades may not work well in these water depths. As a result, taut or semi-taut solutions may be needed.

Mooring Systems

Figure 2. Mooring Systems

 

Unlike a spread-moored catenary system, taut or semi-taut mooring systems require a method of compliance in the heave direction (i.e., in-line spring). This is also true of a tension-leg platform (TLP) in shallow water. Additionally, the anchors need to accommodate a vertical component of the tension load in the mooring line. As a result, lower-cost drag-embedment anchors may not be feasible, and suction anchors may be needed, which can be expensive.

Operations & Maintenance Costs

Inspecting and maintaining floating systems can be expensive. Floating wind turbines are unmanned, and a physical visit to the facility is required for inspections. Inspection of subsea equipment, including hulls, mooring components, and power lines, is challenging. Blade replacements are expensive and hard to do in intense water. As these facilities age and more details fail, maintenance costs increase even further. Many of the pilot projects consider towing the floater back to port. While this is a feasible solution for pilot projects, it may be too expensive at the commercial scale [3]. Additionally, O&M cost reduction is seen as a significant strategy for reducing LCOE [4]

Supply Chain Challenges

While the upcoming floating wind industry faces numerous technical challenges, these can be solved through sound engineering and technology development.  However, the scale of floating wind (e.g., the number of floaters as compared to oil & gas), and regional supply chain pose additional challenges for this industry [3].

Serial Fabrication

The scale of manufacturing the floating wind industry will require is unprecedented.  Nearly every facility the oil & gas industry has built has been a single, custom-built system.  Design and fabrication methods may also struggle to meet the demand and timeline the floating wind industry will command.  Building floaters in today’s offshore oil & gas industry is a month-long process and building tens or hundreds of these in a short timeframe may seem impossible.  Manufacturing at the scale commercial floating wind will require is going to be a significant challenge and may require an evolutionary change to the manufacturing approach akin to Henry Ford and the assembly line.

“Mr. Edison gave America just what was needed at the moment in history. They say that when people think of me, they think of my assembly line. Mr. Edison, you built an assembly line which brought together the genius of invention, science, and industry.” -Henry Ford

This challenge applies to components other than the floater itself.  The number of anchors and mooring lines needed to install tens of hundreds of floaters is beyond anything the oil & gas industry has done before and may impose challenges in meeting demand and timeline.

Infrastructure

Similar to the fabrication challenges, the floating wind industry is forming in many regions with little or no existing infrastructure to support offshore operations.  For example, California does not have the infrastructure or the appropriately skilled workforce to support this industry.  Domestic and local content requirements may exacerbate this challenge.

Other Challenges

Most of this article has been focused on the technical and engineering challenges surrounding the development of floating wind, but there are other challenges worth noting which include:

  • Environmental impact of seabed catenary mooring chain interaction.
  • Coexistence with other ocean users. Mooring takes up a lot of space and floating wind could significantly impact other ocean industries, such as fishing.

How We Can Get There

In order to reach current floating wind targets at an economical LCOE, tremendous effort needs to go toward addressing the challenges described herein.  While challenging, they are not insurmountable, and, as a company with decades of offshore engineering experience, we at SES Renewables recommend the following actions for the industry:

  • Develop cheap O&M solutions. Operation and Maintenance costs can be significantly reduced through condition-based maintenance (CBM) programs that utilize condition monitoring and physics-based digital twins.  Offshore wind typically considers less conservatism in design than oil & gas, yet oil & gas still see’s failures.  An effective CBM program could help prevent unexpected failures (e.g., mooring line failure).  Additional benefits of CBM could design life extension.
  • Study shallow water mooring concepts, particularly those using polyester rope and nylon rope mooring. Research needs to be directed toward understanding the behavior of these materials, particularly regarding load elongation, creep, and fatigue.
  • Consider new anchor concepts that use different materials. For example, the use of materials such as concrete may provide a lower-cost, domestically available solution for anchors.
  • Design for serial manufacturing and quick installation. The oil & gas industry has great solutions for floating systems; however, these solutions were not developed with the primary goal of quickly manufacturing and installing them.  The floating wind industry should optimize component designs so that they can be fabricated and installed cheaper and faster.
  • Invest in the supply chain in the U.S. and potentially Mexico. The supply chain and infrastructure challenges floating wind faces in California are significant.  The U.S.-based oil & gas supply chain can help support the demand; however, Mexico also has a strong oil & gas supply chain and offers another source of supply that could be considered.
  • Utilize oil & gas expertise. The oil & gas industry has decades of experience in solving technical problems for floating systems which can provide valuable support for the floating wind industry.
  • Advanced research and development through Joint Industry Projects (JIPs).  JIPs are a great way for the industry to collectively advance research and solve challenges that are common across the industry.  Many of the challenges discussed in this article are perfect JIP topics.

References

[1]  Offshore Wind Market Report:  2022 Edition, U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, 2022.

[2]  A Historical Review on Integrity Issues of Permanent Mooring Systems, Kai-tung Ma; Hongbo Shu; Philip Smedley; Didier L’Hostis; Arun Duggal, OTC-24025-MS, Offshore Technology Conference, Houston, Texas, USA, May 2013.

[3] Floating offshore wind challenged by supply chain conundrum, https://splash247.com/floating-offshore-wind-challenged-by-supply-chain-conundrum/.

[4]  2020 Cost of Wind Energy Review, T. Stehly, P. Duffy, National Renewable Energy Laboratory, Golden, CO, NREL/TP-5000-81209.

[5] Windfloat Atlantic, https://www.windfloat-atlantic.com/.